Haberler   
  English   
  Kurdî   
  En.Haberler.Com - Latest News
SEARCH IN NEWS:
  HOME PAGE 07/07/2024 08:51 
News  > 

Road construction in Istanbul will last for 90 days! D-100 highway will be reduced to 2 lanes.

Road construction in Istanbul will last for 90 days! D-100 highway will be reduced to 2 lanes.

04.07.2024 16:11

Due to the construction work that Istanbul Metropolitan Municipality will carry out on the metrobus route between Küçükçekmece and Yenibosna, the D-100 highway will be reduced to 2 lanes. The work will start on Saturday, July 6th and will last for 90 days.

The Istanbul Metropolitan Municipality (IMM) will carry out the "White Road" project between Küçükçekmece and Yenibosna on the metrobus route, which will last for 90 days, causing the D-100 highway to be reduced to 2 lanes.

ROADS BETWEEN KÜÇÜKÇEKMECE AND YENİBOSNA WILL BE RENEWED

According to the statement made by IMM, the third stage works will be carried out on the concrete road instead of asphalt on the metrobus route. After the completion of the "White Road" application, which includes 9 stops on the metrobus route between Yenibosna-Cevizlibağ and Beykent-IMM Social Facilities, as well as the section between Cevizlibağ-Mecidiyeköy, now the metrobus stops and the roads between Küçükçekmece and Yenibosna will be renewed.

THERE WILL BE NO DEFORMATION FOR 20 YEARS

Within the scope of the works to be carried out by the IMM Road Maintenance and Infrastructure Coordination Department, the worn-out asphalt will be removed. With the special prescription concrete coating "White Road", it is aimed to have no deterioration or deformation on the road where asphalt works are carried out every year for 20 years and to provide a comfortable journey.

IT WILL LAST FOR 90 DAYS

The renovation of the 17,560-meter long road between Küçükçekmece and Yenibosna, which includes both directions, will start on Saturday, July 6th. The work, which will cover 5 stops and will be carried out in both directions, will last for 90 days, and during the work, the D-100 highway will be reduced to 2 lanes on the specified route.

There will be no disruption in metrobus services, and the road construction will start on the D-100 highway in the direction of Beylikdüzü between Yenibosna-Sefaköy stops.



 
Latest News



  • He entered the sea at night, and his body was found in a fragmented state 4 hours later.
  • Despite the warnings of his friends, 45-year-old Ferhat Y. went into the sea in Kandıra, Kocaeli at night. After a while, he disappeared. After a search operation that lasted approximately 4 hours, his lifeless body was found with his face and body torn apart. It is being considered that Ferhat Y.'s lifeless body was torn apart as a result of being hit by a boat propeller.
  • 24 minutes ago...


 
 
Top News