The 20-minute journey has dropped to 5 minutes! The road connecting 4 provinces has officially opened.

The 20-minute journey has dropped to 5 minutes! The road connecting 4 provinces has officially opened.

29.11.2026 10:00

Minister of Transport and Infrastructure Abdulkadir Uraloğlu officially inaugurated the 8.7-kilometer-long Boyabat Ring Road in Sinop. Uraloğlu announced that the Boyabat city passage, which exceeded 20 minutes during peak hours, has dropped to 5 minutes, and that the road is projected to save 434 million lira annually. The Minister also opened the Türkeli City Passage to service the same day.

The ring road in the Boyabat district of Sinop, which moves transit traffic outside the city center, was officially put into service with a ceremony. The official opening of the road, which had previously been opened to traffic, was held as part of Minister Uraloğlu's Sinop program.

JUNCTION POINT OF 4 PROVINCES

Speaking at the opening ceremony, Uraloğlu recalled that Boyabat is located at the junction point of highway corridors connecting Sinop, Samsun, Kastamonu and Çorum to each other. Uraloğlu said that the district carries an important intercity traffic load in addition to its own urban traffic.

"Today we came to our Sinop with two pieces of good news, with two new projects," said Uraloğlu, continuing as follows: "First of all, we are putting the Boyabat Ring Road, where we are located, into service all together. In fact, we had already put it into service; now we are jointly holding its official opening."

8.7 KILOMETERS, DIVIDED ROAD STANDARD

According to the information provided by Uraloğlu, the Boyabat Ring Road was built to the standard of a divided road with hot bituminous mixture pavement. The project also includes a 4.2-kilometer-long connection road and 2 grade-separated interchanges.

Stating that with the road, urban and transit traffic have been separated from each other, Uraloğlu expressed that traffic congestion, noise and exhaust pollution will decrease, and road and pedestrian safety will increase. Uraloğlu said, "We have now reduced the Boyabat city passage, which exceeded 20 minutes during peak hours, to just 5 minutes."

ANNUAL SAVINGS OF 434 MILLION LIRA

According to the Ministry's calculations, the ring road is expected to provide annual savings totaling 434 million lira, 381 million lira from time and 53 million lira from fuel. Carbon emissions are also expected to decrease by approximately 2,500 tons annually.

TÜRKELİ PASSAGE REDUCED TO 1.5 MINUTES

After the ceremony in Boyabat, Uraloğlu attended the opening of the Türkeli City Passage. With the 2.1-kilometer road built as 4 lanes, 2 outbound and 2 inbound, the passage time in the district fell from approximately 10 minutes to 1.5 minutes. The project is expected to save a total of 25 million lira per year, 23 million lira from time and 2 million lira from fuel.

Noting that the existing road became insufficient due to tourism activity in the summer months, Uraloğlu said that the new passage would raise the standard of the Sinop-Kastamonu coastal route.

"SOLVE THIS PROBLEM OF SİNOP AS SOON AS POSSIBLE"

In his speech, Uraloğlu also touched upon the construction process of the Sinop-Boyabat road and recalled that he served as the Regional Director of Highways in the region at that time. Recounting that then-Prime Minister Recep Tayyip Erdoğan gave the instruction to complete the road as soon as possible, Uraloğlu said that for the approximately 50-kilometer road, they set up 3 asphalt plants instead of one. The road, completed despite landslides and difficult terrain conditions, had been put into service in February 2009.

132 BILLION LIRA INVESTMENT IN SİNOP

Uraloğlu announced that approximately 132 billion lira has been invested in Sinop's transportation and communication infrastructure over the last 24 years. The length of divided roads in the city, which was 4 kilometers in 2003, has increased to 130 kilometers today. In the same period, the length of roads with hot bituminous mixture pavement reached 254 kilometers from 3 kilometers. In the city, which had no tunnels in 2003, 10 tunnels with a total length of 12.8 kilometers are now in service.

PASSENGER COUNT AT THE AIRPORT INCREASED 8-FOLD

Sinop Airport, which was closed before 2002, was reopened to civil aviation in 2008. The new terminal of approximately 13,000 square meters, which entered service in 2017, has an annual capacity of 2 million passengers. The number of passengers at the airport, which was 14,464 in 2008, reached approximately 116,000 in 2025. Six reciprocal flights are operated between Sinop and Istanbul.

In order to provide you with a better service, we position cookies on our site. Your personal data is collected and processed within the scope of KVKK and GDPR. For detailed information, you can review our Data Policy / Disclosure Text. By using our site, you agree to our use of cookies.', '