Attention Istanbul residents! Demolition has begun, the road will be closed to traffic for 6 days.

Attention Istanbul residents! Demolition has begun, the road will be closed to traffic for 6 days.

24.05.2025 07:41

Work has begun at the Avcılar Toll Plaza on the European Highway, which is one of the important connection points in Istanbul. The demolition of the toll booths initiated for the Free Passage System will take 6 days, during which the road will be closed to traffic.

İşte mevcut HTML yapısını bozmadan metnin İngilizceye çevrilmiş hali:



```html

Work on the establishment of a Free Passage System at the O-3 European Highway's Avcılar Toll Collection Station, under the responsibility of the General Directorate of Highways, began at 23:00.

THE ROAD WILL BE CLOSED FOR 6 DAYS

As part of the works, the existing concrete toll booths will be demolished. The work, which is planned to be completed within 6 days on a 24-hour basis, has resulted in the closure of entry and exit to the highway from the Avcılar toll booths in both directions during this period.

Attention Istanbulites! Demolition has started, the road will be closed to traffic for 6 days

Authorities have directed drivers to the designated alternative routes to prevent any inconvenience.

THE TOLL BOOTHS ARE BEING REMOVED

It was stated that with the implementation of the Free Passage System, the goal is to make traffic flow in the area faster and uninterrupted.

Attention Istanbulites! Demolition has started, the road will be closed to traffic for 6 days


```



Metin ve img etiketlerindeki title ve alt nitelikleri başarıyla İngilizceye çevrilmiştir.

In order to provide you with a better service, we position cookies on our site. Your personal data is collected and processed within the scope of KVKK and GDPR. For detailed information, you can review our Data Policy / Disclosure Text. By using our site, you agree to our use of cookies.', '