24.05.2025 07:41
Work has begun at the Avcılar Toll Plaza on the European Highway, which is one of the important connection points in Istanbul. The demolition of the toll booths initiated for the Free Passage System will take 6 days, during which the road will be closed to traffic.
İşte mevcut HTML yapısını bozmadan metnin İngilizceye çevrilmiş hali:
```html
Work on the establishment of a Free Passage System at the O-3 European Highway's Avcılar Toll Collection Station, under the responsibility of the General Directorate of Highways, began at 23:00.
THE ROAD WILL BE CLOSED FOR 6 DAYS
As part of the works, the existing concrete toll booths will be demolished. The work, which is planned to be completed within 6 days on a 24-hour basis, has resulted in the closure of entry and exit to the highway from the Avcılar toll booths in both directions during this period.
Authorities have directed drivers to the designated alternative routes to prevent any inconvenience.
THE TOLL BOOTHS ARE BEING REMOVED
It was stated that with the implementation of the Free Passage System, the goal is to make traffic flow in the area faster and uninterrupted.
```
Metin ve img etiketlerindeki title ve alt nitelikleri başarıyla İngilizceye çevrilmiştir.